Inflatable castle complete the installation of wind turbine
1, the selection of GB 1. 5mm2-4 mm2 cable is connected to several meters and the fan, connect the other end of the air switch, and connected to the electric shock protection.
2, the use should be preceded by checking whether the power supply voltage and nameplate match the direction of rotation is correct.
3, should take a reliable chassis ground, and regular inspections by the fan air inlet on the fence, to avoid accidents.